National Medicines and Poisons Board (NMPB)
🇸🇩 Sudan · AfricaDraft, not yet verifiedAI-checked 14 November 2026
Official site (opens in new tab)UpdatesICSR rulebook
26 open questions. 5 confirmed fields across identity and jurisdiction, official communication and safety communication pages. Check the regulator's own text before a submission or compliance decision.
Your case at NMPB
Postmarketing (MAH, NMPB GVP requirements 2019) · Other serious
7 calendar days
- Goes to
- National Medicines and Poisons Board (NMPB), Pharmacovigilance Centre (PVC)
- Day 0
- Initial receipt of the information by any personnel of the MAH (C.1.4)
- Route
- NMPB Pharmacovigilance Centre, on the PVC form by e-mail
- Format
- PVC suspected ADR reporting form by e-mail
- Note
- Serious ADRs in Sudan, as soon as possible, from first receipt by any MAH personnel, medical representatives and contractors included.
- Rule
- NMPB-TL-DOMESTIC v2
- Legal text
- 4 (scope), 5 (basic requirements: QPPV in Sudan, annual PSUR executive summary), 6 (pharmacovigilance system), 9.1 (what to report,…
4 of 14 clock-table cells have a captured time frame; 7 are not captured yet. Each cell below says why.
At a glance: 4 key cases
- Marketed · Other serious7 calendar days→ National Medicines and Poisons BoardNMPB-TL-DOMESTIC v2
- Trial · Fatal or life-threateningNot capturedNot captured in the rulebook yetNMPB-CT v1
- Marketed · Cases outside SudanNot mentioned→ National Medicines and Poisons BoardNMPB-TL-FOREIGN v2
- Marketed · Non-serious30 calendar days→ National Medicines and Poisons BoardNMPB-TL-DOMESTIC v2
This week at NMPB
Coming up in the next 90 days: Sudan
Compliance at a glance
- ICSRs in Sudan7 calendar days serious · 30 calendar days non-seriousSerious: as soon as possible, from first receipt by any MAH personnel. Valid ICSRs on the PVC form.NMPB-TL-DOMESTIC v2
- Cases outside SudanNot mentionedThe requirements do not mention cases outside Sudan.NMPB-TL-FOREIGN v2
- Clinical trial SAEs and SUSARsNot capturedTrials need the Council's approval (Act 2009, Art. 22); no safety-reporting rule was found.NMPB-CT v1
- Periodic reportPSUR, 70 calendar days after the data lock pointFor intervals up to 12 months; longer intervals have a longer clock. A PSUR executive summary is due every year.NMPB-GOV-PSUR v1
- SubmissionPVC suspected ADR form, by e-mailNo E2B route is stated. The QPPV must be placed in Sudan.NMPB-SUB-ROUTE v1
- Local presenceNot confirmedSee the MAH requirements below.
Reporting clocks
| Case | Postmarketing (MAH, NMPB GVP requirements 2019) | Clinical trial (Medicines and Poisons Act 2009) |
|---|---|---|
| Fatal or life-threatening | 7 calendar days (serious)No separate fatal clock: serious ADRs that occurred in Sudan, as soon as possible.NMPB-TL-DOMESTIC v2 | Not capturedThe Act requires the Council's approval for trials; no SAE or SUSAR reporting rule was found.NMPB-CT v1 |
| Other serious | 7 calendar daysSerious ADRs in Sudan, as soon as possible, from first receipt by any MAH personnel, medical representatives and contractors included.NMPB-TL-DOMESTIC v2 | Not capturedNo SAE or SUSAR reporting rule was found, domestic or foreign.NMPB-CT v1 |
| Serious, expected | 7 calendar daysExpectedness is not a condition: serious cases share one clock.NMPB-TL-DOMESTIC v2 | Not in rulebookNo clinical-trial clock is captured. |
| Non-serious | 30 calendar daysFrom receipt by the MAH. Table 2 also asks for a cumulative table in the PSUR; how the two relate is not explained.NMPB-TL-DOMESTIC v2 | Not in rulebookNo clinical-trial clock is captured. |
| Cases outside Sudan | Not mentionedThe requirements do not mention cases outside Sudan; the serious row of Table 2 is headed "occurred in Sudan".NMPB-TL-FOREIGN v2 | Not in rulebookNo clinical-trial clock is captured. |
| Literature | No separate clockMAHs monitor their active substances in a widely used literature database. No time frame for literature cases is stated.NMPB-LIT v1 | Not in rulebookNo literature rule for clinical trials is captured. |
| Follow-up | 7 days, only if a serious case becomes non-seriousLater follow-ups then use the non-serious time frame. No clock is stated for new information on a case that stays serious.NMPB-FU v1 | Not in rulebookNo clinical-trial clock is captured. |
Other NMPB clocks
- Significant safety issue (not an ICSR), from the MAH being notified72 hoursNMPB-TL-SAFETY-ISSUE v1
- PSUR, from the data lock point70 calendar days interval up to 12 months · 90 calendar days interval over 12 monthsNMPB-GOV-PSUR v1
Work out a date
Where reports go
| Product | Goes to | Clock |
|---|---|---|
| Registered products: ADRs in Sudan | NMPB Pharmacovigilance Centre, on the PVC form by e-mailNMPB-TL-DOMESTIC v2 NMPB-SUB-ROUTE v1 | 7 calendar days serious · 30 calendar days non-serious |
| Registered products: cases outside Sudan | Not mentioned in the requirementsNMPB-TL-FOREIGN v2 | See the rules |
| Significant safety issues | Pharmacovigilance Centre, by letter or e-mail (not an ICSR)NMPB-TL-SAFETY-ISSUE v1 | 72 hours from the MAH being notified |
| Quality defects, adulterated or counterfeit products | Pharmacovigilance Centre, on the serious-ADR or safety-issue time frame, as applicableNMPB-TL-SAFETY-ISSUE v1 | See the rules |
| PSURs | Pharmacovigilance Centre; a PSUR executive summary every yearNMPB-GOV-PSUR v1 | 70 calendar days (up to 12 months) · 90 calendar days (over 12 months) |
| Clinical trials (SAEs, SUSARs) | National Council for Medicines and Poisons approves trials; safety reporting not capturedNMPB-CT v1 | See the rules |
| Vaccines (AEFI), medical devices and blood products | Not covered by the NMPB rules in PV Info: check the applicable rules | No clock here |
Public safety data dashboards 1
No national public dashboard found in the PV Info resources directory.
Global
- VigiAccess (WHO global database VigiBase) (opens in new tab)Uppsala Monitoring Centre for the WHO Programme for International Drug MonitoringCheckedDrugsVaccinesPartly public
How many suspected adverse reactions have been reported worldwide for a medicine or vaccine, and of what kind?
Official sites, not copied into PV Info. Report counts are not incidence rates and do not prove causation.All public safety data resources →
E2B(R3) specifics 1
Submission and gateway
Source documents 1
- Requirements for Good Pharmacovigilance Practices in Sudan: For Marketing Authorization Holder (opens in new tab)Guidance · Apr 2019 · Corrected
Identity and jurisdiction 3
- ISO alpha-3 code
- SDN
- Other acronyms and former names
- NMPB
- Territories covered
- Sudan
Official communication 1
- Official homepage URL
- https://www.nmpb.gov.sd/en/ (opens in new tab) NMPB website (English)
Safety communication pages 1
- Directives and news
- https://www.nmpb.gov.sd/en/ (opens in new tab) Homepage news
Open questions 26
- Official name in local language(s)Identity and jurisdiction
- Unconfirmed المجلس القومي للأدوية والسموم (National Medicines and Poisons Board)
- WHO regionIdentity and jurisdiction
- Unconfirmed EMRO
- Regional reliance blocsIdentity and jurisdiction
- Unconfirmed IGAD medicines regulatory harmonisation; no other network identified.
- Parent ministry and governanceIdentity and jurisdiction
- Unconfirmed Federal Ministry of Health
- PV division and national centresIdentity and jurisdiction
- Unconfirmed Pharmacovigilance Department / National Pharmacovigilance Centre, NMPB
- Regulated productsIdentity and jurisdiction
- Unconfirmed medicines, vaccines, medical devices, cosmetics, herbal
- WHO GBT maturity, scope and assessment datesIdentity and jurisdiction
- Unconfirmed WHO GBT maturity level not identified
- Official languagesOfficial communication
- Unconfirmed Arabic, English
- HeadquartersOfficial communication
- Unconfirmed Khartoum (operations disrupted since 2023; possible relocation to Port Sudan)
- Feed types and ingestion methodsData feeds
- Unconfirmed HTML
- Access and authenticationData feeds
- Unconfirmed public; availability affected by conflict
- WHO PIDM membershipReporting systems
- Unconfirmed WHO PIDM full member (c. 2008); confirm on WHO-UMC list
- Legal frameworkMAH requirements
- Unconfirmed Medicines and Poisons Act, 2009
- Local QPPVMAH requirements
- Unconfirmed not identified; check Medicines and Poisons Act 2009 / NMPB PV guideline
- PSMFMAH requirements
- Unconfirmed not identified; check Medicines and Poisons Act 2009 / NMPB PV guideline
- Domestic fatal or life-threatening casesMAH requirements
- Unconfirmed not identified; check Medicines and Poisons Act 2009 / NMPB PV guideline
- Other domestic serious casesMAH requirements
- Unconfirmed not identified; check Medicines and Poisons Act 2009 / NMPB PV guideline
- Domestic non-serious casesMAH requirements
- Unconfirmed not identified; check Medicines and Poisons Act 2009 / NMPB PV guideline
- Foreign safety actionsMAH requirements
- Unconfirmed Domestic cases: not identified; foreign cases: not identified (many African/EMRO NRAs require foreign serious cases only on request or within PSURs); check Medicines and Poisons Act 2009 / NMPB PV guideline
- ICSR follow-up routingMAH requirements
- Unconfirmed not identified; check Medicines and Poisons Act 2009 / NMPB PV guideline
- Clinical trial SUSARsMAH requirements
- Unconfirmed not identified; check national clinical trial guideline / Medicines and Poisons Act 2009 / NMPB PV guideline
- Emerging safety issues and urgent restrictionsMAH requirements
- Unconfirmed not identified; check Medicines and Poisons Act 2009 / NMPB PV guideline
- PSUR and PBRERMAH requirements
- Unconfirmed not identified; PSUR/PBRER (ICH E2C(R2)) likely required at registration renewal or on request; check Medicines and Poisons Act 2009 / NMPB PV guideline
- Risk management plansMAH requirements
- Unconfirmed not identified; check Medicines and Poisons Act 2009 / NMPB PV guideline
- DHPC distribution modelMAH requirements
- Unconfirmed not identified; check Medicines and Poisons Act 2009 / NMPB PV guideline
- Primary citations with URL, edition, effective date and clauseSources
- Unconfirmed Medicines and Poisons Act, 2009 (Sudan)
Not yet recorded: Data feeds, Reporting systems, MAH requirements, Sources.
Other regulators in Africa
- ANPPNational Agency for Pharmaceutical Products · Algeria
- NRAAgencia Reguladora de Medicamentos e Tecnologias de Saude (ARMED) · Angola
- BOMRABotswana Medicines Regulatory Authority (BoMRA) · Botswana
- NRANational Agency for Pharmaceutical Regulation of Burkina Faso (ANRP) · Burkina Faso
- ERISEntidade Reguladora Independente da Saúde (ERIS), Ministry of Health · Cabo Verde
- NRADirection de la Pharmacie du Medicament et des Laboratoires (DPML) · Cameroon
Draft profiles are research in progress and may be incomplete. AI-checked: the date of the last AI research pass against official sources, not a verification by a person. Profile last changed . Spotted an error? Report a correction (public on GitHub). See the use and validation notice.